| Client: |
A leading service station chain |
| Circumstances: |
The existing facility had been totally destroyed by fire and would take 12 months to rebuild |
| Reason for hire: |
To allow minimum possible break in business, the service station required a temporary solution which would incorporate all the existing areas of the service station |
| Requirements: |
PKL supplied a toilet facility, a shop, and a temporary dining and catering facility |
| Solution: |
The facility was delivered, installed and operational whilst the new facility was built |
| Time-scale: |
This facility was operational 3 weeks from the initial phone call, allowing the minimum possible break in business |
|
|
 |
 |
 |