PKL Group Project Case StudiesTemporary kitchen case studiesCommercial Kitchen Rental
Instant construction of complete service station after a fire
Commercial kitchen rental services from PKL have allowed us to provide many facilities. After a fire completely destroyed the MOTO service station at Birchwood we rebuilt a complete temporary facility. Every area of the service station was designed, provided and constructed by PKL, creating a complete modular temporary structure. The complete facility included kitchen and dining area, snack shop and male, female and disabled toilets, including baby change room.
The PKL-built facility was operational within 3 weeks of the initial phone call. Using traditional building methods this would have taken over 12 months.
We assign a PKL Project Manager to all commercial kitchen rental projects to ensure all processes run smoothly from initial design through to installation and commissioning. A time line and mandatory health and safety information will be provided at the beginning of every commercial kitchen rental project along with risk assessments, method statements and a safety plan for the works.
Overview
Size - 600m2
Covers - Variable
Programme of works - 5 weeks
Reason for hire - Emergency hire after fire
Features of hire - Provision of complete temporary motorway service station